Join/Login and make your voice heard Connect With Other Naijatipsland Members

Repairs: Lagos to shut Marine Bridge for 4 months

Lagos State Government, yesterday, disclosed that it intends to shut the Ijora 7up end of the Marine Bridge from February 2 to May 10, 2024, for comprehensive maintenance.

Commissioner for Transportation, Mr. Oluwaseun Osiyemi, who made the announcement, said some alternative routes have been mapped out for motorists during the repairs.

Osiyemi said: “Motorists heading towards Apapa from Marine Bridge are to ply: Malu Road via Mobil Road U-turn to link Marine Bridge Access Ramp (Inbound Apapa) and proceed to Point Road U-turn leading into Marine Bridge (Ijora bound) and follow the Diversion at closed section.

“Through this movement, they will be able to join the counter flow lane on the Apapa bound lane back to the Ijora bound lane after the closed section.”

Osiyemi, however, assured that the traffic management personnel would be deployed to the affected routes to minimize inconveniences and improve traffic flow.

He said: “Marine Bridge Road inwards Malu Road to make use of the Mobil Road U-turn and proceed to Area B/NAGAFF to access Point road U-turn into Marine Bridge (Ijora bound).”

https://www.vanguardngr.com/2024/02/repairs-lagos-to-shut-marine-bridge-for-4-months/

 

0 0 votes
Article Rating
Subscribe
Notify of

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Newest
Oldest Most Voted
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x
Nigeria's Fast-Growing Online Forum
Logo
Verified by MonsterInsights
situs togel sydneylotto situs toto toto slot https://sih3.kepriprov.go.id/berita/ https://fast.indihome.web.id/slot/ https://uninus.ac.id/ togel online terpercaya bento4d situs toto situs toto bento4d